You are currently viewing Assembly Of Completed Overhaul Mobile Coil Tubing Unit

Assembly Of Completed Overhaul Mobile Coil Tubing Unit

Suspension & Axles System Replacement: Replacing the entire suspension and axles system with brand new components. This involved replacing components such as springs, shock absorbers, control arms, and axles.

Brake System Upgrade: Upgrading the brake system to improve braking performance and safety. This involved installing larger brake calipers, rotors, and brake pads, as well as upgrading the brake lines and fluid. Also, two antifreeze system has been modified / installed to the brake system.

Pneumatic System Renewal: Renewing the pneumatic system, which may include components such as air compressors, air tanks, air lines, and pneumatic valves. Ensuring the pneumatic system is in good condition is crucial for various vehicle functions, such as braking and suspension control.

Tire Replacement: Replacing the tires with brand new ones. This is essential for maintaining traction, handling, and overall safety on the road. The perform trailer sand blasting and painting to ensure longevity and aesthetics.

Power Pack Unit:

Diesel Engine Overhaul: Disassembly, inspection, and refurbishment of the diesel engine components, including pistons, cylinders, crankshaft, camshaft, valves, and gaskets. Replacement of worn or damaged parts. Reassembly and testing of the engine to ensure proper operation.

Gearbox Overhaul: Disassembly, inspection, and refurbishment of the gearbox components, including gears, bearings, seals, and synchronizers. Replacement of worn or damaged parts. Reassembly and testing of the gearbox to ensure proper shifting and performance.

Hydraulic Pump Overhaul: Disassembly, inspection, and refurbishment of the hydraulic pumps, including pistons, cylinders, valves, and seals. Replacement of worn or damaged parts. Reassembly and testing of the hydraulic pumps to ensure proper pressure and flow.

Hydraulic Accumulator Overhaul: Disassembly, inspection, and refurbishment of the hydraulic accumulators, including bladder or piston seals and valves. Replacement of worn or damaged parts. Reassembly and testing of the hydraulic accumulators to ensure proper pressure storage and release.

Radiator Overhaul: Disassembly, inspection, and refurbishment of the radiators, including cleaning, repair of leaks, and replacement of damaged fins or tubes. Replacement of worn or damaged hoses and fittings. Reassembly and testing of the radiators to ensure proper cooling performance.

Replacement of Hydraulic Hoses: Installation of 230 new hydraulic hoses to replace old, worn, or damaged hoses. Proper routing and connection of hoses to ensure optimal hydraulic system performance and safety.

Cabin:

Replacement of Cabin Cylinders: Removal and replacement of all cabin cylinders to ensure proper operation of cabin functions such as lifting, tilting, and locking. Enhances safety and functionality by addressing potential issues with worn or damaged cylinders.

Overhaul of Cabin Control Panel: Disassembly and refurbishment of the cabin control panel, including switches, buttons, and displays. Replacement of worn or malfunctioning components to ensure accurate control of cabin functions. Improves reliability and ease of use for operators.

Replacement of Hoses: Installation of 220 new hydraulic hoses and throughout the cabin. Ensures reliable transmission of hydraulic fluid and electrical signals for various cabin systems. Enhances overall reliability and reduces the risk of malfunctions or failures.

Electrical Cables: The electrical cables devices, cabin lighting has been repaired. Also replace power, signal cables and lighting systems throughout the PPU.

Overhaul of Hose Reels and Installation of BOP Hoses: Disassembly, inspection, and overhaul of three hose reels. Installation of new Blowout Preventer (BOP) hoses to ensure seamless operations during critical tasks. Ensures the reliability and functionality of hose reels and associated equipment.

Testing of Coiled Tubing Unit: The successful final function test, conducted by the Client’s overseas team, encompassed thorough testing of the power pack, hydraulic reels, BOP reels, tilt mechanism, and other associated equipment. During this comprehensive evaluation, each component underwent full testing to ensure optimal functionality and performance. This successful test underscores the reliability and operational readiness of the entire system.

Additionally, all mentioned unit applied a Structural Repairs, Sandblasting, and Painting: Structural repairs to address any damage or deterioration in the cabin structure. Thorough sandblasting to remove old paint, rust, and surface imperfections. Painting to provide a protective coating and rejuvenate the cabin’s appearance. Improves aesthetics and prolongs the lifespan of the cabin.